Fifteenth Forward Tee Construction
Above is the men's tee on 15 in it's before state prior to spring 2009. This was a problematic tee as one can see from the shade on boths sides, lack of air circulation, and size.
Here it is immediately after. We removed the cedar trees to the left, installed extensive drainage to protect it from road run off, and lowered the tee surface to gain a little more distance and surface area.
Here it is druing construction showing the extensive internal drainage...this is prior to installing 12" of a sand soil mix.
Below is the construction of the forward tee on 15 in 2005.
Here you can see the shaped up tee, with the irrigation line running to it.
The final product, simple, low prfoile, doesn't detract from the view from the tee behind it.